Gabriel Umpa OJT compilation
WEEK 1 (FEB. 3-7) Feb.3 first day I was assigned to aline wires since I just began working with them they teach me on how to properly put wires in place to avoid the fiber wire to be damage since fiber wires are very fragile Feb. 4 day two they teach me on how to strip fiber for installing modems and later that day on the afternoon I was assigned to install first modem on our clients at tuael with the assistance of my team Feb.5 I was assigned to line wires connecting from our clients to the post and our head made me perform just to experience to climb the ladder for the purpose of stripping fiber at the top for actual work and connecting the fiber for the main box of the company to connect the network to our client Feb.6 they teach me on learning fusion that requires careful handling and a clean work for the purpose of wielding both fragile fiber cables without having a loss of network in order for it to put continuous strength of signals on the other fiber wire Feb....